Swimming Pool Nid-du-Crô

holistic_piscine 

This installation is one of the biggest energy consumers in the city. The interventions will allow to decrease the heating energy demand by 62% (2229 MWh/year) and the electrical energy demand by 10% (126 MWh/year).

Measures

  • gas boilers are replaced by a heat pump and new condensing boilers
  • ground water is used in summer for cooling
  • heat exchangers are installed on the ventilation circuit
  • unglazed solar collectors are installed for pool heating
  • glazed collectors are placed to produce hot water for the showers

Milestones

The boiler room was rebuilt and different adjustments were optimized. The remaining interventions are planned for 2011.