Specifications


Address: Espace de l'Europe 10

Type: Tertiary, new

Surface: 12265m2

Consumption before: 65kWh/m2y (national standard)

Consumption goal: 41kWh/m2y

Key measures: Geothermal energy

Partners: Bauart Architectes et Urbanistes SA


 

Objective

Discover the trajectory of the neighbourhood

Aerial view of Ecoparc in June 2006 (©  E. Bettinelli)


CampusArc2: last stage of the Ecoparc urban development

A new edifice was built where station storing warehouses used to stand. This construction completed the developement of the Train station/Crêt Taconnet neighbourhood which was initiated at the end of the ‘90s.

The TransEurope building is dedicated to higher education. It was designed according to the Minergie standard. Particular attention was paid to grey energy in materials used for building. What's more, in order to minimize the impact on the environment, life cycle analysis was conducted for a number of elements.

Holistic_CampusArc2

Measures

  • Reduction of the thermal energy demand thanks to a well-insulated facade made of prefabricated wood and metal elements
  • Installation of triple-pane windows
  • Heating and cooling with a field of shallow-depth geothermal probes (30m.)
  • Increased valorisation of thermal inertia (no suspended ceilings or services ducts)
  • Natural ventilation in summer thanks to carefully placed skylights
  • Careful choice of building materials and use of clever construction techniques (for example, acoustic isolation between floor and concrete, no coating)

Milestones

Construction work was finished in September 2011

Back to the map